Section 9 - Servers - Activating Servers on a Schedule to Sections

Once the servers have been Scheduled, they will appear in the Active tab ready to be assigned to tables. If the servers are not assigned to a server chart, they will appear under a banner called “Scheduled” and will have to be manually assigned to tables from the Active tab (see Section 5).

If servers are assigned to a chart, they will appear under a banner with the label of the meal period they are assigned to. Selecting a server will reveal a “Activate X Tables” button. Pressing that button will activate the server to the floor, assigning them to the tables detailed in the server chart used. If the server is assigned to tables in two different sections, that will be shown in the Active window. Repeat activation until all desired servers are on the floor.